Brighton Trailhead and Laurel Trail Pedestrian Lighting

Share Brighton Trailhead and Laurel Trail Pedestrian Lighting on Facebook Share Brighton Trailhead and Laurel Trail Pedestrian Lighting on Twitter Share Brighton Trailhead and Laurel Trail Pedestrian Lighting on Linkedin Email Brighton Trailhead and Laurel Trail Pedestrian Lighting link

The Laurel Greenway Master Plan identified the need for pedestrian trail lighting between Peppler Street and Weber Street North, as well as an improved trailhead at Brighton Street to enhance neighbourhood and Greenway connections. The proposed pedestrian lighting will increase safety and extend the useable hours of the trail, especially during the Winter months. The proposed concept for the Brighton Street Trailhead includes safe entry onto the trail system off Brighton Street, wayfinding and interpretation, options for sitting and gathering, and opportunities to view the natural creek-side elements.

The primary goals with the design concept for the Brighton Street Trailhead are to achieve the functional needs of a safe and legible trail entry and to focus the experience of the natural character of this part of Laurel Creek. Opportunities for engaging with natural elements are proposed through interpretative signs, viewing, and unique place-making elements. Seating elements are proposed to respond to the context with durable natural materials while considering comfort and accessibility. The planting plan will take its cues from the banks of Laurel Creek, organizing it in a way that is legible and edge-defining.


The Laurel Greenway Master Plan identified the need for pedestrian trail lighting between Peppler Street and Weber Street North, as well as an improved trailhead at Brighton Street to enhance neighbourhood and Greenway connections. The proposed pedestrian lighting will increase safety and extend the useable hours of the trail, especially during the Winter months. The proposed concept for the Brighton Street Trailhead includes safe entry onto the trail system off Brighton Street, wayfinding and interpretation, options for sitting and gathering, and opportunities to view the natural creek-side elements.

The primary goals with the design concept for the Brighton Street Trailhead are to achieve the functional needs of a safe and legible trail entry and to focus the experience of the natural character of this part of Laurel Creek. Opportunities for engaging with natural elements are proposed through interpretative signs, viewing, and unique place-making elements. Seating elements are proposed to respond to the context with durable natural materials while considering comfort and accessibility. The planting plan will take its cues from the banks of Laurel Creek, organizing it in a way that is legible and edge-defining.


  • Notice of construction and detour - May 2024

    Share Notice of construction and detour - May 2024 on Facebook Share Notice of construction and detour - May 2024 on Twitter Share Notice of construction and detour - May 2024 on Linkedin Email Notice of construction and detour - May 2024 link

    Construction will begin in early May at the enhance of the Brighton Street Trailhead, which will formalize connections between the trail to the neighbourhood and Brighton Park.

    The Laurel Trail will be closed between Bridgeport Road East and Weber Street North for approximately eight weeks, beginning in early May. Trail closure signs with maps showing the proposed detour will be posted at each affected trail access point for the duration of closure.

    Detour Route A:

    • Go west on Bridgeport Road East
    • Turn right onto Peppler Street
    • Turn right onto Noecker Street
    • Turn right onto Weber Street North
    • Follow Weber Street to reconnection with the Laurel Trail

    Detour Route B:

    • Go south on Weber Street North
    • Turn right on Bridgeport Road East
    • Follow Bridgeport Road East to reconnect with the Laurel Trail

  • Notice of construction and detours - starting Oct 2

    Share Notice of construction and detours - starting Oct 2 on Facebook Share Notice of construction and detours - starting Oct 2 on Twitter Share Notice of construction and detours - starting Oct 2 on Linkedin Email Notice of construction and detours - starting Oct 2 link

    The next phase of construction is to install pedestrian lighting along the portion of the Laurel Trail between Brighton Street and Weber Street. We expect this section of the Laurel Trail to be closed for approximately three weeks starting October 2, 2023.

    Detour route: Use Brighton Street, Noecker Street and Weber Street (both directions)

    Map showing Laurel trail closed between Brighton St and Weber St N, with a detour route shown from Brighton Street, Noecker Street and Weber Street.


  • Notice of construction and detours

    Share Notice of construction and detours on Facebook Share Notice of construction and detours on Twitter Share Notice of construction and detours on Linkedin Email Notice of construction and detours link

    Construction has begun to install the pedestrian lighting along a portion of the Laurel Trail, between Pepper Street and Weber Street. We expect this section of the Laurel Trail to be closed for approximately three weeks starting September 18, 2023.

    Detour route A:

    1. Go north onto Brighton Street
    2. Turn left onto Noecker Street
    3. Turn left onto Peppler Street
    4. Follow Peppler Street to Laurel Street intersection

    Detour route B:

    1. Go west on Bridgeport Road
    2. Turn right onto Peppler Street
    3. Turn right onto Noecker Street
    4. Turn right onto Brighton Street
    5. Follow Brighton Street to end of cul-de-sac

    When this section is complete. we will move north between Brighton and Weber. Be sure to subscribe to this page for updates!

  • Public Information Centre summary

    Share Public Information Centre summary on Facebook Share Public Information Centre summary on Twitter Share Public Information Centre summary on Linkedin Email Public Information Centre summary link

    Public Information Centre, held Wednesday, March 1, 2023 6:00 – 8:00pm at Moses Springer Community Centre

    A Public Information Centre (PIC) was held in-person on March 1st from 6:00pm to 8:00pm to give the public a chance to view and comment on the intent for the Brighton Street Trailhead and Lighting of the Laurel Greenway between Weber and Peppler Streets. The PIC was hosted by Emily Brown, Senior Landscape Architect / Public Realm Specialist, The City of Waterloo, and Michael Barker & Christian Stewart of SHIFT Landscape Architecture.

    The option for an in-person PIC was offered for the purpose of equitable engagement by providing a way for those who may not have access to the internet or prefer to view physical panels a chance to share their opinion. The in-person PIC also provided community members the opportunity to have more in-depth discussions and for those who had more elaborate questions which may have required a direct response. A notice of the PIC was delivered to residences and businesses in the surrounding neighbourhood 2 weeks before the event; a sign was posted at the location of the Brighton Street trailhead and additionally, information about the event and the project were posted on the Engage Waterloo site.Three comments were left on the engage site prior to the meeting taking place.

    The PIC had 16 attendees sign in; however, in a few instances one person signed for a group of 2 or 3 people and some people did not sign in. It is estimated that 25 people attended the event.

    Participants were encouraged to fill out a comment sheet providing their feedback on the project intent. 15 comment sheets were completed.

    Comment Sheets and Online Comments

    Overall, most of the discussion submitted on the comment sheets and which took place in person was very positive. There was a general consensus that lighting the trail from Weber to Bridgeport is necessary and the idea was well received. A few people noted concern that light would shine into homes, but the intent is to have the lighting directed at the trail only with minimal to no spillage.

    There was discussion at the meeting which was reiterated on the comment sheets about the importance of Brighton Park to the neighbourhood and that it should be considered for redesign. Although outside the scope of this current project there is a strong rationale for updating this park in the future both for its ability to support the Laurel Greenway and the proposed trail head.

    Several people commented on the location of the proposed path that will connect Brighton Street to the LGW. The currently proposed location does not account for the existing desire line which is present on the site. The suggested location, shown in the concept plan, creates a logical transition from the LGW to Brighton Street, but picking up the desire line as part of the design intention is also beneficial. SHIFT will review the current layout and find a solution that accommodates both things.

    Prior to the meeting there was uncertainty of whether lighting should be included along the stretch of the trail from Bridgeport Street to Peppler Street for two reasons. First there is lighting from a few of the surrounding uses (namely Christian Horizons) that can be considered ‘borrowed light’ for the LGW and second, because it is not feasible to introduce lighting to the area of the trail that requires it the most (just south of Bridgeport Street). The reason for this is because of the presence of a Butternut tree. Butternut is a regulated and protected tree in the Province of Ontario and no construction of any kind can take place within 30m of any one tree. However, at the meeting a representative of Christian Horizons stated he would be in favour of lighting being installed adjacent to his property. This area will be studied further so the City can make a decision of whether or not to light this section.

    There were several people who commented in all forums about the crossing of the LGW at Weber Street. It has been suggested that the crossing is unsafe and people do not feel safe crossing at this point. This seems to be especially true for people who have bicycles. As part of the LGW study a proposed crossing was designed that would alleviate these issues. This will be implemented in the future as part of other planned projects. At this point, however, there is no specific known timeline for when this project will take place.

    One resident was unhappy with the plan as currently illustrated because no seating has been extended north and south along the LGW from the Brighton Street Trailhead. Their reason for wanting this was so that people who feed ducks present in the creek have a place to sit. It is currently unknown whether feeding the ducks is actually desired by the City or not. This will be discussed and if it is something that the City wants to encourage than benches could potentially be added in a few locations north and south from the proposed trail head.

    A few other suggestions made on the comment sheets were: replace words on the concrete bands with graphics (this will be studied as it could present interesting options); Dog waste disposal bins and/or trash bins (currently uncertain if City operations would support this or if the existing garbage bin at Brighton Park would suffice); drinking fountain (not anticipated) mosquito control; indigenous history (the concept is intended to tell the story of the creek and area pre-colonialization however there will not be explicit reference to indigenous terms, language or similar); ensure the space is inclusive for all physical abilities (it is intended that the space will meet AODA standards at a minimum and be universally accessible if possible); Include an eco passage under the trail; Do not add seating at the trailhead but instead place seating in Brighton Park (the trailhead space will support Brighton Park adding a new dimension to it and a future revitalization of Brighton Park will support the trail head and the LGW) and plant native trees & plants (this is planned and will be included).

    There were several comments made online, in person and on the comment sheets stating ‘don’t cut anymore trees down’. There will be limited or no tree removal for this project, but the comment is noted here for the City’s information.

    Conclusions

    The responses received in person, online and on the comment sheets indicate a very favourable opinion of the project in general and the intended concept specifically. All comments heard will be reviewed in the context of the concept plan and those that support a stronger final project will be implemented if possible. Some of the comments received are either outside the scope of the project or not feasible given budget constraints and operational limitations.

    SHIFT will develop a final iteration of the concept plan for review by the City prior to beginning the development of detailed design and contract documents.

  • Notice of public meeting March 1, 2023

    Share Notice of public meeting March 1, 2023 on Facebook Share Notice of public meeting March 1, 2023 on Twitter Share Notice of public meeting March 1, 2023 on Linkedin Email Notice of public meeting March 1, 2023 link

    The City of Waterloo (City) is developing a detailed design for the Brighton Street Trailhead and Pedestrian Lighting along the Laurel Trail between Peppler Street and Weber Street North. The City’s Laurel Greenway Master Plan identified and prioritized the trailhead enhancements to formalize connections to the neighbourhood and Brighton Park, and pedestrian lighting to extend the useable hours and safety of the Laurel Trail in this area.

    Join us March 1, 2023, for a Neighbourhood Meeting.

    We invite you to learn more and provide your feedback at a Neighbourhood Meeting. Here you’ll learn more about:

    • The trailhead concept (developed using feedback received from the Laurel Greenway Master Plan)
    • Proposed pedestrian lighting


    Date: March 1, 2023
    Time: 6:00 p.m. – 8:00 p.m.
    Location: Moses Springer Community Centre: 150 Lincoln Road, Waterloo, ON N2J 4A8

    If you require accommodations for viewing any project information, please contact Emily Brown.

    We appreciate your time, interest, and cooperation in this project. Please contact us should you have any further questions, comments, or concerns.

    Emily Brown, OALA, CSLA
    Senior Landscape Architect / Public Realm Specialist
    City of Waterloo
    emily.brown@waterloo.ca

    100 Regina Street South
    PO Box 337, Station Waterloo
    Waterloo, ON N2J 4A8

    Michael Barker, OALA, CSLA
    Principal
    SHIFT Landscape Architecture Co. Inc.
    mbarker@shiftland.com

    100 Crimea Street, Unit C7
    Guelph, ON N1H 2Y6


Page last updated: 18 Apr 2024, 08:55 AM