Reimagining Westwood Park

Share Reimagining Westwood Park on Facebook Share Reimagining Westwood Park on Twitter Share Reimagining Westwood Park on Linkedin Email Reimagining Westwood Park link

This project is complete and the park is now open for use. Thank you to everyone who contributed to the redesign of the park. If you have any questions, please contact the Parks division at parks@kitchener.ca or 519-741-2345 (TTY:1-866-969-9994).


Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.

During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.

We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.

Stay informed

Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.

Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.

During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.

We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.

Stay informed

Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.

This project is complete and the park is now open for use. Thank you to everyone who contributed to the redesign of the park. If you have any questions, please contact the Parks division at parks@kitchener.ca or 519-741-2345 (TTY:1-866-969-9994).


  • Previous page content (summer 2021)

    Share Previous page content (summer 2021) on Facebook Share Previous page content (summer 2021) on Twitter Share Previous page content (summer 2021) on Linkedin Email Previous page content (summer 2021) link

    We have updated the home page for the project. If you are looking for information that was up here previously, you can find it below:

    Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared by an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to renovate the park, upgrading existing features to modern standards, and provide elements and features that reflect the needs of the community.

    The City is working with a team of consultants from SHIFT Landscape Architecture to lead the redevelopment of this space, including conceptual design, final design, and seeing the project through to the construction phase.

    With the current phase, we are collecting information to understand how the park currently serves the community and where improvements might be made. Below and in the links to the right, you will find an existing conditions plan of the park along with some recent site photographs for your reference.

    Fill out our survey below to share your feedback about the proposed concepts. We also encourage you to fill out the “Ideas” board below with your thoughts or ideas for the park space.

    Have a question? We know people are tired of virtual meetings but are perhaps not yet comfortable with in person events, so we're doing this consultation a different way. From August 9 to 13 we will host an online forum right here on this page. The project team will be closely monitoring this forum during business hours that week, answering your questions in real time. Visit this page anytime that week to ask questions, make comments and learn more about the Westwood Park project.