Share Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction on FacebookShare Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction on TwitterShare Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction on LinkedinEmail Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction link
As part of the City of Waterloo’s asset management and road rehabilitation programs, we'll be improving the road, watermain and sewer system on Teakwood Drive from Glen Forrest Boulevard to Thorncrest Drive, Teakwood Place from Teakwood Drive to the cul-de-sac, and Thorncrest Drive from west of Teakwood Drive to Glen Forrest Boulevard. Construction is tentatively scheduled from April 2023 to November 2023, subject to all technical and financial approvals.
The planned improvements for Teakwood Drive, Teakwood Place, and Thorncrest Drive are:
Replace the existing sanitary sewer, storm sewer, and watermain to meet current capacity requirements and design standards.
Replace the existing sanitary and water service laterals to each property from the new mains to the property line.
Replace the existing asphalt with a new 7.0 metre wide paved roadway and install new concrete curb and gutter and replace all existing sidewalks with new 1.8 metre wide concrete sidewalk.
Replace all existing driveway ramp entrances within the municipal right-of-way to conform to current city standards.
Restoration of disturbed areas with topsoil and sod.
We want to make sure that anyone affected or interested in this work can easily stay informed about the work being done, and how it may affect them. We want you to let us know if you have any special requirements or have experienced any issues in the past that we may be able to address as a part of this project. This includes things like basement flooding, special driveway access requirements during the construction phase, information on your existing house services, or anything else you think we might need to know, particularly if you have special needs regarding access for mobility issues. If there is something that will help us reduce impact to you during our project, please let us know! We are listening.
Kyle Bossie, P.Eng., PMP (he/him) Senior Project Engineer – City of Waterloo Engineering Services, Design and Construction Waterloo City Centre 100 Regina Street South Waterloo, ON N2J 4A8 Phone: 519-886-1550 ext. 78256 Email: kyle.bossie@waterloo.ca
Paul Rodrigues, C.E.T. Consultant Project Manager – WalterFedy Civil Engineering 675 Queen Street South, Suite 111 Kitchener, ON N2M 1A1 Phone: 519-576-2150 ext. 426 Email: prodrigues@walterfedy.com
As part of the City of Waterloo’s asset management and road rehabilitation programs, we'll be improving the road, watermain and sewer system on Teakwood Drive from Glen Forrest Boulevard to Thorncrest Drive, Teakwood Place from Teakwood Drive to the cul-de-sac, and Thorncrest Drive from west of Teakwood Drive to Glen Forrest Boulevard. Construction is tentatively scheduled from April 2023 to November 2023, subject to all technical and financial approvals.
The planned improvements for Teakwood Drive, Teakwood Place, and Thorncrest Drive are:
Replace the existing sanitary sewer, storm sewer, and watermain to meet current capacity requirements and design standards.
Replace the existing sanitary and water service laterals to each property from the new mains to the property line.
Replace the existing asphalt with a new 7.0 metre wide paved roadway and install new concrete curb and gutter and replace all existing sidewalks with new 1.8 metre wide concrete sidewalk.
Replace all existing driveway ramp entrances within the municipal right-of-way to conform to current city standards.
Restoration of disturbed areas with topsoil and sod.
We want to make sure that anyone affected or interested in this work can easily stay informed about the work being done, and how it may affect them. We want you to let us know if you have any special requirements or have experienced any issues in the past that we may be able to address as a part of this project. This includes things like basement flooding, special driveway access requirements during the construction phase, information on your existing house services, or anything else you think we might need to know, particularly if you have special needs regarding access for mobility issues. If there is something that will help us reduce impact to you during our project, please let us know! We are listening.
Kyle Bossie, P.Eng., PMP (he/him) Senior Project Engineer – City of Waterloo Engineering Services, Design and Construction Waterloo City Centre 100 Regina Street South Waterloo, ON N2J 4A8 Phone: 519-886-1550 ext. 78256 Email: kyle.bossie@waterloo.ca
Paul Rodrigues, C.E.T. Consultant Project Manager – WalterFedy Civil Engineering 675 Queen Street South, Suite 111 Kitchener, ON N2M 1A1 Phone: 519-576-2150 ext. 426 Email: prodrigues@walterfedy.com
Please share any questions you may have about this project with our project team.
Your username and question will be published on this site for public viewing. Please note, if you choose to identify yourself with your first and last name in the username field, your name will be available for public viewing. For more information, please refer to our privacy policy.
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction has finished this stage
Issued a Request For Proposal to procure an engineering consultant for the project. This project was awarded to WalterFedy.
Preliminary design
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction has finished this stage
Gather all existing information about the project area and begin the design process. Identifying constraints and issues to determine solutions in final design.
Virtual information session
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction has finished this stage
Preliminary design information available online (physical copies available on request).
Detailed design
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction has finished this stage
Account for public feedback from the first information sesson and solve issues in design identified in the preliminary design.
Tender
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction has finished this stage
Post an open bid tender to procure a contractor according to the city’s Purchasing by-law.
In-person information session
Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction is currently at this stage
In-person Public Information Centre with project construction team
Construction
this is an upcoming stage for Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction
Reconstruct the roads and services in the Project Area
Warranty period
this is an upcoming stage for Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction
Two year warranty period for work
Project close-out
this is an upcoming stage for Teakwood Drive, Teakwood Place and Thorncrest Drive reconstruction
Release all parties from their contracts and close the project out.
Videos
Click here to play video
Public Information Centre for Teakwood and Thorncrest
This narrated video describes the project work for Teakwood Drive, Teakwood Place and Thorncrest Drive.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends