Update May 11, 2021

The contractor, Bel-Air is occupying Stage 1A between Whiting Way to approximately 160m east of Forler Street.

Proposed work for this week:

Layout and installation of temporary watermain which will result in intermitted driveway disruptions (while the pipe is buried through driveways) as well as commencing removals of asphalt, curb, and topsoil

Cut and cap for the temporary watermain feed (tentatively scheduled for Thursday May 13, 2021).

Notices for the water shutdown will be distributed 48 hours in advance of the shutdown

Please find the distributed notice here for the upcoming water shutdown.