Final Project Design Details

As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road, sewer and watermain improvements in your neighbourhood on the street listed above.

These improvements are scheduled to begin, on or about, April 3, 2023, with an estimated completion date on or about September 15, 2023. You will be notified closer to the date construction is scheduled to start on your section of the street, and also how long access to your driveway will be affected.

The specific improvements scheduled for these streets are:

Upgrade the existing storm sewer, sanitary sewer and water mains.

  • Replace existing sanitary, storm and water services from the new mains to the property line.
  • Replace curb and gutter, and sidewalks.
  • Upgrade the asphalt roadway.
  • Replace all driveway ramp entrances in concrete

These improvements are being done to upgrade the existing, deteriorated underground services and above ground surface features, in order to prevent future system failure. The project will be funded through utility user fees and will not result in a direct charge to the homeowner.

Presentation materials were shared with the public last year outlining the details of the proposed improvements to these streets. Updated details have been posted for viewing of all members of the public including owners and residents that will be directly affected by the proposed improvements. For more information regarding this project please visit Engagewr.ca/RoadReconstruction. If you would like to receive updates for this project as they become available, please subscribe and you will be added to the email list for updates on this project.

If you have any questions and/or concerns about this project, please feel free to contact either of the project managers, listed below.

Share Final Project Design Details on Facebook Share Final Project Design Details on Twitter Share Final Project Design Details on Linkedin Email Final Project Design Details link

The construction is now complete, and the project has entered the maintenance phase. This means we will inspect all aspects of the work done to ensure that it meets our standards. We will also address any deficiencies. Once this phase is complete, we will add a final layer of surface asphalt. This is usually about two years from the start of maintenance. If you have any questions or concerns, please contact us at 519-741-2345 or engineering@kitchener.ca


<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>