Pedestrian Bridge 22 replacement and Colonial Creek rehabilitation

Share Pedestrian Bridge 22 replacement and Colonial Creek rehabilitation on Facebook Share Pedestrian Bridge 22 replacement and Colonial Creek rehabilitation on Twitter Share Pedestrian Bridge 22 replacement and Colonial Creek rehabilitation on Linkedin Email Pedestrian Bridge 22 replacement and Colonial Creek rehabilitation link

Construction has now concluded and the trail is open.

The City of Waterloo is proceeding with the replacement of Pedestrian Bridge 22 and creek restoration in Kaufman Flats located at 753 University Ave. East, Waterloo. This work to rehabilitate the creek shoreline will minimize the risk of erosion and bank failure. It will also improve the water quality in the creeks, and promote a healthy and diverse habitat for fish.

The pedestrian bridge is a prefabricated steel bridge with a new load limit that can accommodate City of Waterloo operation vehicles.

What to expect during construction

In order to carry out this work, the entrance to the Claude Dubrick Trailway, including the pedestrian bridge crossing the creek, will be temporarily closed for the duration of construction. Construction will not require any road closures and will not prevent access to any private properties.

This map depicts the expected construction area, you can download a pdf version by visiting the Documents section.

Who will be doing the work?
A private contractor, VanDriel Excavating Inc., selected through the City’s public tender process, will undertake the work.

When will the works begin and how long will they take?
Weather permitting, construction will commence on or about July 4, 2023 and is to be completed by August 15, 2023.

How will the construction affect me?
In order to carry out this work, the entrance to the Claude Dubrick Trailway, including the pedestrian bridge crossing the creek, will be temporarily closed for the duration of construction. Construction will not require any road closures and will not prevent access to any private properties.

Will sanitary sewer and water services be interrupted?
There will be no impacts to sewer or water services during construction.

How can I provide comments?

Comments can be emailed, or phoned in to the project contacts listed here, or submitted through our Comments section.

Becky Phylactou
Engineering Infrastructure, Engineering Services
Integrated Planning & Public Works
Waterloo City Centre
100 Regina Street South
Waterloo, ON N2J 4A8
Phone: 519-866-1550 Ext. 78252
Email: becky.phylactou@waterloo.ca

Dylan Wick
VanDriel Excavating Inc.
P.O. Box 339
Clinton ON N0M 1L0
Cell: 519-955-4163
Email: dylan@vandrielinc.com

Simon Green P.Eng.
GM BluePlan Engineering Limited
650 Woodlawn Road West, Block C, Unit 2
Guelph, ON N1K 1B8
Phone: 519-824-8150 ext. 1216
Email: simon.green@gmblueplan.ca

The City of Waterloo is proceeding with the replacement of Pedestrian Bridge 22 and creek restoration in Kaufman Flats located at 753 University Ave. East, Waterloo. This work to rehabilitate the creek shoreline will minimize the risk of erosion and bank failure. It will also improve the water quality in the creeks, and promote a healthy and diverse habitat for fish.

The pedestrian bridge is a prefabricated steel bridge with a new load limit that can accommodate City of Waterloo operation vehicles.

What to expect during construction

In order to carry out this work, the entrance to the Claude Dubrick Trailway, including the pedestrian bridge crossing the creek, will be temporarily closed for the duration of construction. Construction will not require any road closures and will not prevent access to any private properties.

This map depicts the expected construction area, you can download a pdf version by visiting the Documents section.

Who will be doing the work?
A private contractor, VanDriel Excavating Inc., selected through the City’s public tender process, will undertake the work.

When will the works begin and how long will they take?
Weather permitting, construction will commence on or about July 4, 2023 and is to be completed by August 15, 2023.

How will the construction affect me?
In order to carry out this work, the entrance to the Claude Dubrick Trailway, including the pedestrian bridge crossing the creek, will be temporarily closed for the duration of construction. Construction will not require any road closures and will not prevent access to any private properties.

Will sanitary sewer and water services be interrupted?
There will be no impacts to sewer or water services during construction.

How can I provide comments?

Comments can be emailed, or phoned in to the project contacts listed here, or submitted through our Comments section.

Becky Phylactou
Engineering Infrastructure, Engineering Services
Integrated Planning & Public Works
Waterloo City Centre
100 Regina Street South
Waterloo, ON N2J 4A8
Phone: 519-866-1550 Ext. 78252
Email: becky.phylactou@waterloo.ca

Dylan Wick
VanDriel Excavating Inc.
P.O. Box 339
Clinton ON N0M 1L0
Cell: 519-955-4163
Email: dylan@vandrielinc.com

Simon Green P.Eng.
GM BluePlan Engineering Limited
650 Woodlawn Road West, Block C, Unit 2
Guelph, ON N1K 1B8
Phone: 519-824-8150 ext. 1216
Email: simon.green@gmblueplan.ca

Comments

Please share any additional comments you may have with our project team.

Your username and comments will be published on this site for public viewing. Please note, if you choose to identify yourself with your first and last name in the username field, your name will be available for public viewing. For more information, please refer to our privacy policy.

Construction has now concluded and the trail is open.

CLOSED: This discussion has concluded.