Share Olympic Drive: Pattandon Avenue to Hoffman Street on FacebookShare Olympic Drive: Pattandon Avenue to Hoffman Street on TwitterShare Olympic Drive: Pattandon Avenue to Hoffman Street on LinkedinEmail Olympic Drive: Pattandon Avenue to Hoffman Street link
As part of the City of Kitchener’s ongoing efforts to provide consistent and reliable service, we have scheduled road and sewer improvements in your neighbourhood on the street(s) listed above.
These improvements are scheduled to begin, around April 2025, with an estimated completion around October 2025. You will be notified closer to the date construction is scheduled to start on your section of the street, as well as how long access to your driveway will be affected.
The specific improvements scheduled for this street are:
Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required.
Replace existing sanitary and water services from the new mains to the property line.
Curb and gutter, and sidewalks will be installed.
Upgrade the asphalt roadway.
Replace all driveway ramp entrances in concrete.
Install and/or replace retaining walls.
These improvements will upgrade the existing, deteriorated underground services and above-ground surface features, in order to prevent future system failure. The project will be funded through utility user fees and will not result in a direct charge to the homeowner.
In order to carry out these improvements, it will be necessary to close this street to through traffic. Prior to any road closure, signs will be posted on the approaching streets advising motorists of the date and the duration of the closure.
Pedestrian access will be maintained to all properties at all times and vehicular access to all properties within the construction area will be maintained for as long as possible. On-street parking permits, which will allow parking on adjacent side streets, will be hand-delivered to affected homes before vehicular access is cut off.
For more details about how this construction may affect you, please read the Information Package
Progress and major milestones will be posted on this project page. Subscribe to get project updates by using the Stay Informed 'Subscribe' button above.
As part of the City of Kitchener’s ongoing efforts to provide consistent and reliable service, we have scheduled road and sewer improvements in your neighbourhood on the street(s) listed above.
These improvements are scheduled to begin, around April 2025, with an estimated completion around October 2025. You will be notified closer to the date construction is scheduled to start on your section of the street, as well as how long access to your driveway will be affected.
The specific improvements scheduled for this street are:
Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required.
Replace existing sanitary and water services from the new mains to the property line.
Curb and gutter, and sidewalks will be installed.
Upgrade the asphalt roadway.
Replace all driveway ramp entrances in concrete.
Install and/or replace retaining walls.
These improvements will upgrade the existing, deteriorated underground services and above-ground surface features, in order to prevent future system failure. The project will be funded through utility user fees and will not result in a direct charge to the homeowner.
In order to carry out these improvements, it will be necessary to close this street to through traffic. Prior to any road closure, signs will be posted on the approaching streets advising motorists of the date and the duration of the closure.
Pedestrian access will be maintained to all properties at all times and vehicular access to all properties within the construction area will be maintained for as long as possible. On-street parking permits, which will allow parking on adjacent side streets, will be hand-delivered to affected homes before vehicular access is cut off.
For more details about how this construction may affect you, please read the Information Package
Progress and major milestones will be posted on this project page. Subscribe to get project updates by using the Stay Informed 'Subscribe' button above.
This survey will ask you about things we may need to consider when planning this road reconstruction. It will also ask you whether you are interested in a storm drain connection.
We appreciate your cooperation. A city staff member may contact you if we need more information about your comments.
If you have any questions, contact Steve Allen, Engineering Manager, at steve.allen@kitchener.ca or 519-741-2200 x7584
Share Resident/Owner Questionnaire on FacebookShare Resident/Owner Questionnaire on TwitterShare Resident/Owner Questionnaire on LinkedinEmail Resident/Owner Questionnaire link
Page last updated: 14 Nov 2024, 02:17 PM
Follow Project
Stay informed
Subscribe for project updates
Lifecycle
Project Announced
Olympic Drive: Pattandon Avenue to Hoffman Street has finished this stage
Please review this page for information about this upcoming road reconstruction project
Questionnaire Open
Olympic Drive: Pattandon Avenue to Hoffman Street has finished this stage
Please answer our resident/owner questionnaire, which helps us design the reconstruction project while taking your circumstances into consideration
Review and Preparation
Olympic Drive: Pattandon Avenue to Hoffman Street is currently at this stage
We are reviewing the questionnaire results and preparing for the reconstruction of this road
Under Construction
this is an upcoming stage for Olympic Drive: Pattandon Avenue to Hoffman Street
Construction is now underway on this street
Final Inspection
this is an upcoming stage for Olympic Drive: Pattandon Avenue to Hoffman Street
We are doing a final review and inspection
Project Complete
this is an upcoming stage for Olympic Drive: Pattandon Avenue to Hoffman Street
This road reconstruction project is finished
Report an issue
Call us 24 hours a day 7 days a week to report an issue with construction on your street
Road reconstructions help Kitchener adapt to climate change
Replacing outdated stormwater pipes and adding green infrastructure during road construction makes Kitchener more resilient to future flooding caused by climate change. This road reconstruction project is funded in part by the Government of Canada. For more information about the City of Kitchener's partnership with the Government of Canada through the Disaster Mitigation and Adaptation Fund, visit kitchener.ca/Stormwater
Soak up rain and reduce runoff
Kitchener has partnered with Reep Green Solutions to help you make changes to beautify your yard and reduce runoff. To learn more and see if you qualify for a free, on-site consultation with a landscape designer, visit Reep's Rain Smart Neighbourhoods.