Your Meadowlane Park, your watershed

Share Your Meadowlane Park, your watershed on Facebook Share Your Meadowlane Park, your watershed on Twitter Share Your Meadowlane Park, your watershed on Linkedin Email Your Meadowlane Park, your watershed link

We are looking for ways to improve water quality and reduce flood risks through stormwater measures at Meadowlane Park. We thank the community for your participation – and your patience – while we look for a design solution that:

  • reduces future flood risks
  • protects and improves water quality
  • is technically workable
  • fits into current park uses
  • fits within the project budget

For more information on this project, please read the project background.

Construction is expected to take place in 2025.

Stay Informed

Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.

We are looking for ways to improve water quality and reduce flood risks through stormwater measures at Meadowlane Park. We thank the community for your participation – and your patience – while we look for a design solution that:

  • reduces future flood risks
  • protects and improves water quality
  • is technically workable
  • fits into current park uses
  • fits within the project budget

For more information on this project, please read the project background.

Construction is expected to take place in 2025.

Stay Informed

Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.

  • Field studies in November

    Share Field studies in November on Facebook Share Field studies in November on Twitter Share Field studies in November on Linkedin Email Field studies in November link

    There will be some activity in Meadowlane Park on or around Nov. 11, 2024.

    We will be doing archaeological studies in the park. This is a required investigation in preparation for the Meadowlane Park stormwater management pond construction in 2025. On or around Nov. 11, archaeologists will visit the park and hand dig test pits, which they will sift for artifacts. All pits dug will be filled in at the end of the investigation.

    If you have any questions, contact us at MeadowlanePark@kitchener.ca

  • What we heard about the final design option

    Share What we heard about the final design option on Facebook Share What we heard about the final design option on Twitter Share What we heard about the final design option on Linkedin Email What we heard about the final design option link

    Thank you to those of you who joined us this summer at the open house on July 16, 2024, and those who filled out the design survey for Meadowlane Park. It was great to hear your feedback on the final design.

    For a detailed report on what we heard from community members at the open house and online, please read the summary: What We Heard Report

    Common Themes

    • Design: We heard general support for the final design option and appreciation for how it preserves the park's essence and supports wildlife and pollinators
    • Amenities: You like the addition of natural seating and year-round trails
    • Mount Frederick: We heard that Mount Frederick is an important year-round amenity, and you are happy to see it stay in the design
    • Planting: You were supportive of the planting plan which includes more trees and native plants
    • Maintenance: You would like to see regular maintenance of the pond and plantings once built

    Next Steps

    Thank you for your input throughout the design process. Once a final design is confirmed, it will be shared here on Engage Kitchener. We will reach out to community members again as we get closer to construction.

    If you haven’t already, please subscribe to be notified about future events. Add your email to the Stay Informed section of this page and click ‘Subscribe’.


  • Video presentations now available

    Share Video presentations now available on Facebook Share Video presentations now available on Twitter Share Video presentations now available on Linkedin Email Video presentations now available link

    Thank you to everyone who attended the open house on July 16, 2024. Recorded presentations are now available for the key features of the design:

    Whether you attended the open house or not, we would like your feedback! Please fill in our survey so we can hear what you think about the draft design options.

    Answer the survey

  • Missed the open house? Answer our survey

    Share Missed the open house? Answer our survey on Facebook Share Missed the open house? Answer our survey on Twitter Share Missed the open house? Answer our survey on Linkedin Email Missed the open house? Answer our survey link

    The presentation materials from our in-person open house today are now available online. We will also share a video presentation on July 24, 2024.

    View the presentation boards

    Survey now open

    Whether you attended the open house today or not, we want your feedback! Check out the presentation boards and tell us what you think. The detailed design survey is available until August 15, 2024.

    Answer the survey

    How we have engaged the community lately

    We are continuing to work on the design of a stormwater pond in Meadowlane Park:

    • On November 8, 2023 we held an Open House to gather feedback on six (6) design options
    • Over the winter and spring, we developed a design shaped by the public feedback we received, internal feedback and constraints
    • On June 10, 2024, we presented a draft design to the Meadowlane Park Community Resource Group (CRG) and used their feedback to refine the design
  • Open House today moved to Meadowlane School parking lot

    Share Open House today moved to Meadowlane School parking lot on Facebook Share Open House today moved to Meadowlane School parking lot on Twitter Share Open House today moved to Meadowlane School parking lot on Linkedin Email Open House today moved to Meadowlane School parking lot link

    Due to the weather, we have moved the open house to the Meadowlane Public School parking lot (236 Forestwood Drive).

    We’ll be there from 3 to 7 p.m. today, just look for the tents. Drop by any time to view the final park design and learn more about the project. Reep Green Solutions will also be there to share interactive games, activities, and climate adaptation education.

    If you can’t make it, we’ll post the materials online later this afternoon and you’ll have the option to answer a survey instead.

  • Open house tomorrow, rain or shine

    Share Open house tomorrow, rain or shine on Facebook Share Open house tomorrow, rain or shine on Twitter Share Open house tomorrow, rain or shine on Linkedin Email Open house tomorrow, rain or shine link
    supporting image

    Thank you to all who registered for the open house on July 16, 2024. The event will be in the park near the pollinator garden. You can enter the park from Royal Orchard Drive.

    We are looking forward to seeing you there! The event will take place “rain or shine”. The design boards will be under a tent for your convenience.


  • Join us at the open house next week, July 16

    Share Join us at the open house next week, July 16 on Facebook Share Join us at the open house next week, July 16 on Twitter Share Join us at the open house next week, July 16 on Linkedin Email Join us at the open house next week, July 16 link


    July 16, 2024

    3 to 7 p.m.

    Meadowlane Park (138 Glen Park Crescent)

    Learn more or register

    We look forward to seeing you then.

    If you are not able to attend the open house, we will be posting the design boards and a video on Engage shortly after the open house. You will be able to provide feedback online until August 15, 2024.

    Can’t enter the park due to accessibility restrictions? We are happy to meet you at the park entrance to discuss our open house details. Call 519-501-5687 for assistance.

  • Save the date, July 16 open house

    Share Save the date, July 16 open house on Facebook Share Save the date, July 16 open house on Twitter Share Save the date, July 16 open house on Linkedin Email Save the date, July 16 open house link

    July 16, 2024

    3 p.m. to 7 p.m.

    Meadowlane Park (138 Glen Park Crescent)

    Please register

    It’s been several months since we met with the community at the November 2023 Open House to share design options for Meadowlane Park. We’re almost ready to share a draft design that the community’s feedback helped shape.

    We met with the Meadowlane Community Resource Group on June 10, to gather their initial feedback. This summer we will be looking for comments and feedback from the community on those designs.

    About the open house:

    • Learn more about the project and review the design.
    • Drop in anytime. Staff and consultants will be available to receive your feedback and answer questions.
    • Cool treats and children’s activities will be available.
    • Reep Green Solutions will share interactive games, activities, and climate adaptation education.

    If you can't attend this in-person event, you can participate virtually. We will post materials on this webpage for you to review and comment on close to the event.

  • What we heard about the design options

    Share What we heard about the design options on Facebook Share What we heard about the design options on Twitter Share What we heard about the design options on Linkedin Email What we heard about the design options link

    Last fall, we hosted an open house for Meadowlane Park. Thank you to everyone who joined us at the Open House on Nov. 8, 2023, and provided their feedback on the design options.

    For a detailed report on what we heard from community members at the open house and online, please read the summary: 2023 What We Heard Report


    Common Themes

    • Significance of Mt. Frederick: We heard about the importance of Mt. Fredrick as a park amenity for the community year-round.
    • Accessible trails: You want trails to be accessible and cleared in winter.
    • Connect with nature: You enjoy having a natural space to connect with nature, plants and animals.
    • Meadowlane Park as a gathering Space: You expressed the importance of having a space for activities and learning.
    • Safety: You are concerned with safety around the pond during winter months.


    Design Ideas

    We also heard ideas of what you want incorporated into designs for the stormwater pond and the park. You would like the design to include:

    • “Shaded seating and gathering space”
    • “Open space for recreational activities”
    • “More natural play areas”
    • “Trails close to plants and water”


    Frequently Asked Questions updated

    Thanks for all the questions you have shared with us. We have added responses to new questions in the Frequently Asked Questions section

    Next Steps

    Thank you for your patience as we develop a park design based on City staff and your feedback. We look forward to hosting a project open house this year once the designs are ready.

    If you haven’t already, please subscribe to be notified about future events. Add your email to the Stay Informed section of this page and click ‘Subscribe’.

    If you have any questions, contact us at meadowlanepark@kitchener.ca

  • Healthy Yards Webinar Series

    Share Healthy Yards Webinar Series on Facebook Share Healthy Yards Webinar Series on Twitter Share Healthy Yards Webinar Series on Linkedin Email Healthy Yards Webinar Series link

    Some of you have asked, “What more can be done in our neighbourhood to reduce the amount of runoff that reaches the park/creek?”

    As you know, we are working to better manage runoff in Sandrock Creek with a stormwater project in Meadowlane Park. Meanwhile, our partner Reep Green Solutions, can help residents who live upstream from the project manage rain and reduce runoff that reaches the park.

    The Rain Smart Neighbourhoods Project helps you plan projects for your yard that will help reduce flood risk in the neighbourhood by planting more trees, building rain gardens, soaking up rain in permeable paving, and more.

    This spring, join Reep’s Healthy Yard Webinar Series to learn how you can make changes in your yard that will improve the nature in your neighbourhood and extend the benefits of this project! You can also learn more about Healthy Yard Consultations, available to residents who want to help reduce flood risk for the neighbourhood with actions in their own yard.

    Register for the webinar series at reepgreen.ca/events

    Webinars include:

    • Healthy Yards: Nurture Nature in Your Neighbourhood - March 28, 2024 from 7 to 8 p.m.
    • Healthy Yards: Rain Garden Design and Construction - April 3, 2024 from 7 to 8 p.m.
    • Healthy Yards: Nurture Nature in Your Neighbourhood - April 10, 2024 from 7 to 8 p.m.


    As you know, we are working to better manage runoff in Sandrock Creek with a stormwater project in Meadowlane Park. Meanwhile, our partner Reep Green Solutions, can help residents who live upstream from the project manage rain and reduce runoff that reaches the park.

Page last updated: 17 Dec 2024, 03:37 PM