Virtual Public Information Centre 2

CLOSED: This discussion has concluded.

The City of Waterloo is pleased to announce that it has procured Navacon Construction Inc. to complete the reconstruction of Mackay Crescent. Construction will be lead by Navacon’s project coordinator Caleb Myers. Samy Mohamed from the City’s engineering consultant, IBI Goup, will also be on-site fulltime providing inspection services and liaising with residents.

Typically, the project team would hold an in-person pre-construction meeting to share the latest information with residents and answer your questions about the reconstruction. Unfortunately, that is not possible in the current circumstances of the COVID-19 pandemic. Residents are encouraged to review the updated design drawings (pdf) and the updated information package (pdf), and if you have any questions regarding construction, please submit them to us using the Questions feature, and the project team will respond as soon as possible.

Please note that reconstruction projects of this nature often have a number of uncertainties. Certain material in this package such as dates, schedules and phasing can change as the project progresses based on weather, the availability of subcontractors, previously unknown conditions beneath the surface, etc.

City and Consultant Contacts

For this project, the City has retained the services of an engineering consultant to prepare the design and provide support during construction. During construction, the consultant will have a full-time inspector on-site to monitor construction activities and liaise with residents. The City will also have a part-time inspector on-site.

Samy Mohamed
Construction Inspector, IBI Group
Phone: (519) 598-1229
Email: Samy.Mohammed@IBIGroup.com

Caleb Myers
Project Coordinator, Navacon Construction Inc
Phone: (519) 758-4231
Email: Calebmyers@navaconinc.com

Rob Nolan, C.E.T.
Construction Inspector, City of Waterloo
Phone: (226) 747-6384
Email: Rob.Nolan@waterloo.ca

City of Waterloo After-Hours #
Phone: (519) 579-9557

Share Virtual Public Information Centre 2 on Facebook Share Virtual Public Information Centre 2 on Twitter Share Virtual Public Information Centre 2 on Linkedin Email Virtual Public Information Centre 2 link