83 to 85 Hickory St W and 265 to 267 Hemlock St W (OPA-42, Z-22-13)
Application to amend zoning for 83 to 85 Hickory St W and 265 to 267 Hemlock St W
Changes to the Official Plan and the Zoning Bylaw for this location are required before a permit can be issued. This means that they submit an application that is reviewed by city planners and other agencies plus city council before anything can be built.
DCB Development Canada is proposing development of a six storey residential development consisting of 203 bedrooms in 168 units.
Official plan changes requested include:
- creating a new Specific Provision Area (SPA) allowing a maximum density of 597 bedrooms per hectare
Zoning bylaw changes requested include:
- Increasing the maximum density from 250 bedrooms per hectare to 597 bedrooms per hectare
- reducing the required distance from the rear property line to 3.0 metres, where 7.5 is required
- allowing exterior stairs to be built within the required Neighbourhood Frontage Street Line Setback on Hemlock Street
- allowing the building to project into the required daylight triangle from the third storey and above
- reducing the minimum landscape open space from 30% to 23%
- lifting the Holding (H) symbol from the subject property
View the documents submitted by the development company under Supporting Documents on this page for more details and drawings.
Building height, units, housing types
Tallest tower: 6 storeys
Number of units: 168
Unit sizes: 6 studio, 119 one bedroom, 25 one bedroom plus den, and 18 two bedroom units
Housing types: 168 apartments
Parking
Parking: 57 underground
Bicycle parking: 41 indoor secure and 16 outdoor
You can provide feedback to the planning department, and it will be shared with the council, or ask a question to learn more about this application.
Images are provided by the applicant and may not reflect the final design approved by the Planning Department.
Ask a question, read answers
Questions and answers will be published on this site for public viewing. If your username includes your first or last name, or your email address, these will be available for public viewing. Do not include personal or identifying information in your question; if your question is of a personal nature, consider contacting a member of the project team directly. For more information, please refer to our privacy policy.
Questions will be answered by a member of the Planning department within two business days. Some questions may require more time but they will be answered as soon as the information for the response can be collected.