Frederick Street: Bruce Street to Victoria Street North
Share Frederick Street: Bruce Street to Victoria Street North on FacebookShare Frederick Street: Bruce Street to Victoria Street North on TwitterShare Frederick Street: Bruce Street to Victoria Street North on LinkedinEmail Frederick Street: Bruce Street to Victoria Street North link
As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood.
The reconstruction is being done to replace the older, deteriorated underground services. It is anticipated that construction will occur in two phases with phase one planned for 2024 and phase two in 2025.
The following is a brief list of specific improvements being considered:
Upgrade the existing storm sewer, sanitary sewer and water mains as required
Replace existing sanitary and water services from the new mains to the property line
Curb and gutter, and sidewalks will be installed
Upgrade the asphalt roadway
Replace all driveway ramp entrances in concrete
Please read the Information Package for more details about how this construction may affect you. All residents are also invited to review the project information boards for more information. Progress and major milestones will be posted on this page.
As more information becomes available, we will post it to this page. Subscribe to get email notification of project updates by using the Stay Informed 'Subscribe' button.
As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood.
The reconstruction is being done to replace the older, deteriorated underground services. It is anticipated that construction will occur in two phases with phase one planned for 2024 and phase two in 2025.
The following is a brief list of specific improvements being considered:
Upgrade the existing storm sewer, sanitary sewer and water mains as required
Replace existing sanitary and water services from the new mains to the property line
Curb and gutter, and sidewalks will be installed
Upgrade the asphalt roadway
Replace all driveway ramp entrances in concrete
Please read the Information Package for more details about how this construction may affect you. All residents are also invited to review the project information boards for more information. Progress and major milestones will be posted on this page.
As more information becomes available, we will post it to this page. Subscribe to get email notification of project updates by using the Stay Informed 'Subscribe' button.
We appreciate your cooperation and will do our best to take your feedback into consideration. A city staff member may contact you if we need more information about your comments.
Please fill out this survey by Dec. 29, 2023.
If you have any questions, contact Steve Allen, Engineering Manager, at steve.allen@kitchener.ca or 519-741-2200 x7584
Share Resident/Owner Questionnaire on FacebookShare Resident/Owner Questionnaire on TwitterShare Resident/Owner Questionnaire on LinkedinEmail Resident/Owner Questionnaire link
We would like to survey the residents within the project limits. Are you interested in having private storm drain connections? These connections would accept sump pump discharge or surface drainage from private property. Please respond by Dec. 29, 2023.
Share Storm Service Survey on FacebookShare Storm Service Survey on TwitterShare Storm Service Survey on LinkedinEmail Storm Service Survey link
Page last updated: 11 Dec 2024, 03:08 PM
Follow Project
Stay informed
Subscribe for project updates
Lifecycle
Project Announced
Frederick Street: Bruce Street to Victoria Street North has finished this stage
Please review this page for information about this upcoming road reconstruction project
Questionnaire Open
Frederick Street: Bruce Street to Victoria Street North has finished this stage
Please answer our resident/owner questionnaire, which helps us design the reconstruction project while taking your circumstances into consideration
Review and Preparation
Frederick Street: Bruce Street to Victoria Street North has finished this stage
We are reviewing the questionnaire results and preparing for the reconstruction of this road
Under Construction
Frederick Street: Bruce Street to Victoria Street North is currently at this stage
Construction is now underway on this street
Project Complete
this is an upcoming stage for Frederick Street: Bruce Street to Victoria Street North
This road reconstruction project is finished
Report an issue
Call us 24 hours a day 7 days a week to report an issue with construction on your street
Road reconstructions help Kitchener adapt to climate change
Replacing outdated stormwater pipes and adding green infrastructure during road construction makes Kitchener more resilient to future flooding caused by climate change. This road reconstruction project is funded in part by the Government of Canada. For more information about the City of Kitchener's partnership with the Government of Canada through the Disaster Mitigation and Adaptation Fund, visit kitchener.ca/Stormwater
Soak up rain and reduce runoff
Kitchener has partnered with Reep Green Solutions to help you make changes to beautify your yard and reduce runoff. To learn more and see if you qualify for a free, on-site consultation with a landscape designer, visit Reep's Rain Smart Neighbourhoods.