Fife Avenue / Ann Street / Becker Street
As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood on the street listed above.
The following is a brief list of specific improvements being considered:
- Upgrade the existing storm sewer, sanitary sewer and watermains as required.
- Rerouting Regional Force Main along Ann Street
- Replace existing sanitary and water services from the new mains to the property line.
- Curb and gutter, and sidewalks will be installed, feasibility will be explored to install a sidewalk on the north side of Becker Street where it does not exist.
- Upgrade the asphalt roadway.
The Road Reconstructions and underground utilities relocations/replacements are planned to accommodate MTO’s Frederick Street Bridge replacement for the future New Hwy 7 alignment.
How you may be affected
In order to carry out these improvements, it will be necessary to close this street to through traffic. Prior to any road closure, signs will be posted on the approaching streets advising motorists of the date and the duration of the closure.
Pedestrian access will be maintained to all properties at all times and vehicular access to all properties within the construction area will be maintained for as long as possible. On-street parking permits, which will allow parking on adjacent side streets, will be hand-delivered to affected homes before vehicular access is cut off.
Before construction starts, an inspection of homes and businesses will be undertaken to determine the condition of buildings in the construction area. The selected consulting firm will contact you directly to arrange for a voluntary inspection of the exterior and interior of your building. This inspection is done to protect the property owner.
More information
Please read the Information Package for more details about how this construction may affect you. All residents are also invited to review the project information boards for more information.
Progress and major milestones will be posted on this project page, subscribe to get email notification of project updates by using the Stay Informed 'Subscribe' button.