Preliminary concept from 2016 Stormwater Master Plan

Thank you for your questions and feedback. We are continuing to do an initial assessment of soil conditions and the water table. Subscribe to this page for information about the next phases of this project.

Preliminary concept from the 2016 Stormwater Master Plan

We added a preliminary concept to the document library. This shows early ideas for the stormwater management ponds in Countryside Park. This concept is from the Stormwater Master Plan, approved by Council in 2016.

Do you need an accessible version of this document? Please get in touch with Chris Nechacov Chris.Nechacov@kitchener.ca, 519-741-2200 x 7148

Share Preliminary concept from 2016 Stormwater Master Plan on Facebook Share Preliminary concept from 2016 Stormwater Master Plan on Twitter Share Preliminary concept from 2016 Stormwater Master Plan on Linkedin Email Preliminary concept from 2016 Stormwater Master Plan link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>