The Township of Woolwich is currently working with GHD Limited on the design of Barnswallow Drive for reconstruction in 2024.

The scope of the Barnswallow Drive work includes the replacement of the existing underground storm and sanitary sewers, the addition of a new trunk sanitary sewer, replacement of the full pavement structure, and the installation of curb and gutter and sidewalks along both sides of the street. As well, infrastructure will be installed to accommodate future development in this area.

The Township of Woolwich is currently working with GHD Limited on the design of Barnswallow Drive for reconstruction in 2024.

The scope of the Barnswallow Drive work includes the replacement of the existing underground storm and sanitary sewers, the addition of a new trunk sanitary sewer, replacement of the full pavement structure, and the installation of curb and gutter and sidewalks along both sides of the street. As well, infrastructure will be installed to accommodate future development in this area.