556, 560, 576 Conservation Dr (Z-16-14, 30T-16402)
Application to amend zoning for 556, 560, 576 Conservation Dr
Changes to the Zoning Bylaw for this location are required before a permit can be issued. This means that they submit an application that is reviewed by city planners and other agencies plus city council before anything can be built.
2115881 Ontario Limited Holding is proposing to create 478 residential units, including single detached dwellings and townhomes, a proposed new public elementary school, parks, a stormwater management block and protected open space. There is a subdivision proposal being reviewed by the Region of Waterloo.
Zoning bylaw changes requested include:
- rezoning the lands from agriculture 'A' to Residential (R), Medium Density Three (MD3), Institutional (IN), Green One (G1) and Green Two (G2) with site specific provisions for the proposed R and MD3 zones to accommodate specific house, lot and/or building designs
View the documents submitted by the development company under supporting documents on this page for more details and drawings.
Building height, units, housing types
Height of tallest building: 6 storeys, 20 metres
Housing types: single detached dwellings, townhomes, apartments
You can provide feedback to the planning department, and it will be shared with the council, or ask a question to learn more about this application.
Images are provided by the applicant and may not reflect the final design approved by the planning division.
Ask a question, read answers
Questions and answers will be published on this site for public viewing. If your username includes your first or last name, or your email address, these will be available for public viewing. Do not include personal or identifying information in your question; if your question is of a personal nature, consider contacting a member of the project team directly. For more information, please refer to our privacy policy.
Questions will be answered by a member of the Planning department within two business days. Some questions may require more time but they will be answered as soon as the information for the response can be collected.