Reimagining Westwood Park
This project is complete and the park is now open for use. Thank you to everyone who contributed to the redesign of the park. If you have any questions, please contact the Parks division at parks@kitchener.ca or 519-741-2345 (TTY:1-866-969-9994).
Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.
During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.
We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.
Stay informed
Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.
Westwood Park is an established neighbourhood park within a changing community. The green space was formerly shared with an adjacent school that has since been demolished and is being developed into townhomes. With this project, the intent is to revitalize the park by upgrading existing features to modern standards, and providing elements and features that reflect the needs of the community.
During the summer of 2021, the design team engaged with the public to better understand how the community uses the park. This feedback was used to inform design decisions. As a starting point for discussion, two concepts were developed to show what is possible in the space. After hearing feedback in person and online, and looking at what is needed to bring the park up to current standards, a final concept has been developed.
We are excited to reveal the final concept for Westwood Park. Please review the plan below and the overview video. More information can also be found through the links on this page, including timelines for next steps, additional documents, and a summary of engagement input.
Stay informed
Subscribe for updates and be the first to know about news and information about this project. Add your email to the Stay Informed box on this page and click ‘Subscribe’.
This project is complete and the park is now open for use. Thank you to everyone who contributed to the redesign of the park. If you have any questions, please contact the Parks division at parks@kitchener.ca or 519-741-2345 (TTY:1-866-969-9994).
-
Sept. 19 park opening celebration at 4 p.m. (NEW TIME)
Share Sept. 19 park opening celebration at 4 p.m. (NEW TIME) on Facebook Share Sept. 19 park opening celebration at 4 p.m. (NEW TIME) on Twitter Share Sept. 19 park opening celebration at 4 p.m. (NEW TIME) on Linkedin Email Sept. 19 park opening celebration at 4 p.m. (NEW TIME) linkJoin us from 4 to 6 p.m. on September 19 to help celebrate the official opening of Westwood Park!
We changed the start time to a little later so more neighbours can attend. Enjoy free ice cream (while supplies last) and games while learning more about the improvements to the park and connecting with your neighbourhood community.
We hope to see you there!
-
Save the date! Sept. 19 park opening celebration
Share Save the date! Sept. 19 park opening celebration on Facebook Share Save the date! Sept. 19 park opening celebration on Twitter Share Save the date! Sept. 19 park opening celebration on Linkedin Email Save the date! Sept. 19 park opening celebration linkWe are pleased to announce a community celebration for the official opening of the park! Save the date: Sept. 19, 2024 at 3 p.m. in Westwood Park. More details about the event will be announced shortly.
In the meantime, thank you for staying off the newly seeded areas of the park. The fencing remains up and we expect it to stay in place for a few more weeks, until the seed is well established.
-
Important update on Westwood Park
Share Important update on Westwood Park on Facebook Share Important update on Westwood Park on Twitter Share Important update on Westwood Park on Linkedin Email Important update on Westwood Park linkNow that Westwood Park’s construction is complete, we’d like to bring your attention to a few important items.
Signs are up in the turfed areas requesting that the seed is not disturbed while it grows. Please stay off the seeded areas until we remove the signage. This will ensure that seed germinates and the grass thrives.
We also installed new signs at the entrance of the loop path. These remind residents not to use regulation-sized cricket balls in the practice cricket pitch. Also, dogs must be leashed at all times and picked up after. Please respect the park rules, which are in place for everyone’s safety and wellbeing.
You may have noticed water pooling in the park between the two entrances. This area is an infiltration gallery. Its purpose is to collect and hold water from the site while it drains into the soil, a process called infiltration. Sometimes the water drains slowly, so if you see water pooling there, do not be alarmed. That area of the park is functioning as intended.
We hope you enjoy the new and upgraded Westwood Park. Your patience and understanding have been greatly appreciated.
-
Westwood park construction complete!
Share Westwood park construction complete! on Facebook Share Westwood park construction complete! on Twitter Share Westwood park construction complete! on Linkedin Email Westwood park construction complete! linkWe are excited to share that the Westwood Park construction has been completed!
Some fencing will be up until the end of July to let the grass grow. We will confirm when the fencing has come down. Please stay off these areas for the time being. As always, we appreciate your patience and understanding,
-
Next steps, hydroseeding and planting
Share Next steps, hydroseeding and planting on Facebook Share Next steps, hydroseeding and planting on Twitter Share Next steps, hydroseeding and planting on Linkedin Email Next steps, hydroseeding and planting linkThank you all for your patience as the construction of Westwood Park wraps up.
A significant portion of the work has been completed with fine grading, hydroseeding, and planting remaining. The completion of this work depends on the weather but is currently scheduled for next week.
Once the hydroseed is applied, fencing will remain up for Approximately 3 weeks to protect the seed germination. Signage will also be installed asking park users to please stay off the grass as the seed establishes.
Updates will be posted regularly to ensure the community is well informed of the project's progress. Please subscribe for updates to this project. Add your email to the Stay Informed box and click 'Subscribe'.
-
Westwood Park construction progressing on schedule
Share Westwood Park construction progressing on schedule on Facebook Share Westwood Park construction progressing on schedule on Twitter Share Westwood Park construction progressing on schedule on Linkedin Email Westwood Park construction progressing on schedule linkThe cricket pitch and walking loop path are now complete. The asphalt paving is set to begin this week and the playground will be open for use starting next week. The basketball courts are currently closed for line painting and will remain closed until the end of next week.
The remaining works include the infiltration gallery located at the park frontage which will be addressed this week and the hydroseeding which will begin once the weather allows (ideally slightly cooler and wetter conditions).
Site signage is all in place and will remain up until all work is complete.
Updates will be posted regularly to ensure the community is well informed of the project's progress. Please subscribe for updates to this project. Add your email to the Stay Informed box and click 'Subscribe'.
-
Phase 2 construction work is now underway
Share Phase 2 construction work is now underway on Facebook Share Phase 2 construction work is now underway on Twitter Share Phase 2 construction work is now underway on Linkedin Email Phase 2 construction work is now underway linkThe Phase 2 construction work is now underway at Westwood Park. The cricket pitch and walking loop path are the focus of the current work, which includes excavation and topsoil stripping.
Next week, the contractor will be working on completing the asphalt path and line painting. During that time, the playground and basketball court will be closed but will be re-opened once that work is complete. We anticipate the closure will last 4-5 days depending on weather conditions.
Please subscribe to this page for regular updates. Add your email address to the Stay Informed box and click 'Subscribe.'
-
Second phase of construction begins in June
Share Second phase of construction begins in June on Facebook Share Second phase of construction begins in June on Twitter Share Second phase of construction begins in June on Linkedin Email Second phase of construction begins in June linkWestwood Park's second phase of construction is quickly approaching.
You may see some site fencing installed during this week which will fence off all areas except for the playground. The playground will remain open unless otherwise communicated. Areas that are not fenced off at this time may be fenced off later on and an update will be provided prior to any closures.
Construction will begin the second week of June. During the construction, please only use the unfenced amenities as the site will be undergoing construction. We appreciate your understanding!
Updates will be posted regularly to ensure the community is well informed of the project's progress. Please subscribe for updates to this project. Add your email to the Stay Informed box and click 'Subscribe'.
-
Phase 2 construction
Share Phase 2 construction on Facebook Share Phase 2 construction on Twitter Share Phase 2 construction on Linkedin Email Phase 2 construction linkThank you everyone for your patience as we work through the final stages of the Westwood Park redevelopment.
Phase 1 of construction was completed in the fall of 2023, and we are excited to share that the second and final phase of construction will be starting this spring! Moser Landscape Group Inc. has been selected to complete the Phase 2 construction work. Construction will begin soon.
We will try to keep as much of the playground accessible as possible during construction. For certain portions of the work, the playground may have to be closed and an update will be provided prior to the closure. We appreciate your understanding as we work toward getting this park up and ready for use.
This phase of construction will look to complete the practice cricket pitch, install the walking loop path, reconstruct the infiltration gallery and finish up some final works.
Please subscribe for updates to this project by using the 'Stay Informed' button on the Engage project page.
-
New pet waste containers
Share New pet waste containers on Facebook Share New pet waste containers on Twitter Share New pet waste containers on Linkedin Email New pet waste containers linkThere is a new container at the entrance of the park specifically for waste. It is a different style than before, it looks like a green 'T'. When walking your dog or other pet in the park, please pick up and deposit your pet’s waste into this container.
New garbage bins have also been installed at the front of the park. Please put your litter in these bins.
We are still working on getting grass established in the park. Since it is not yet fully established you may notice areas of dirt washing out. We are also in the process of reinstating the swing seats in the park.
If you have any questions, please reach out at WestwoodPark@kitchener.ca
Lifecycle
-
Project Launch & Preliminary Ideas
Reimagining Westwood Park has finished this stageShare your input with the team on the two concepts presented for Westwood Park
-
Under review
Reimagining Westwood Park has finished this stageContributions to this consultation are closed for evaluation and review. The project team will prepare final concept.
-
Final concept
Reimagining Westwood Park has finished this stageBased on feedback a final concept will be presented
-
Tender and construction
Reimagining Westwood Park has finished this stageConstruction is anticipated to start soon
-
Construction underway
Reimagining Westwood Park has finished this stageConstruction is now underway on this park
-
Construction finished
Reimagining Westwood Park has finished this stageThis project is now complete and the park is open again
-
Official park opening
Reimagining Westwood Park is currently at this stageJoin us in celebration of the park's official opening!
Videos
FAQs
- What steps is the City taking to get the contractor to finish the park redevelopment?
- When is Westwood Park redevelopment scheduled to be completed?
- What steps is the City taking to ensure this contractor is not the successful bidder for other work in our city?
- Can a dog park be added to the park?
- Can you tell me more about the cricket pitch?
Document Library
- Westwood Park Refined Concept Plan (493 KB) (pdf)
-
Engagement process
- Westwood Park: Phase1 Engagement Summary (533 KB) (pdf)
- Westwood Park: Phase 2 Park Sign (813 KB) (pdf)
- Westwood Concept 1 Multi-sport court.jpg (1.26 MB) (jpg)
- Westwood Concept 2 Basketball court.jpg (1.28 MB) (jpg)
- Westwood presentation slides.pdf (6.52 MB) (pdf)
- Westwood Sign.pdf (718 KB) (pdf)
- Westwood Park Existing Conditions.pdf (454 KB) (pdf)
Who's Listening
-
Phone 519-741-2345 (TTY:1-866-969-9994) Email WestwoodPark@kitchener.ca -