Welcome to the project page for the planned reconstruction of Union Street East between King Street South and Moore Avenue South. The city intends to completely reconstruct this section of Union to replace the aged watermain, sewers, and road structure (i.e. sidewalk, curbs and asphalt). This will also include the replacement of water and sanitary service laterals up to the common property line. In accordance with the Council approved Transportation Master Plan, separated bike lanes are planned.Additionally, to improve safety where the Spurline Trail crosses Union, a secondary crossing is planned that allows trail users to cross using the signal lights at Union and Moore.
Project updates will be posted in the News feed. and the current progress of the project is noted in the Project Timeline. The page will also be open to public comments for limited time periods, typically following the release of design information. Please check back often or sign up to follow the project to receive email updates.
Welcome to the project page for the planned reconstruction of Union Street East between King Street South and Moore Avenue South. The city intends to completely reconstruct this section of Union to replace the aged watermain, sewers, and road structure (i.e. sidewalk, curbs and asphalt). This will also include the replacement of water and sanitary service laterals up to the common property line. In accordance with the Council approved Transportation Master Plan, separated bike lanes are planned.Additionally, to improve safety where the Spurline Trail crosses Union, a secondary crossing is planned that allows trail users to cross using the signal lights at Union and Moore.
Project updates will be posted in the News feed. and the current progress of the project is noted in the Project Timeline. The page will also be open to public comments for limited time periods, typically following the release of design information. Please check back often or sign up to follow the project to receive email updates.
Two primary design alternatives have been developed for Union Street:
Alternative 1 – new cycling infrastructure (bike lanes)
Alternative 2 – pedestrian-focused
Alternative 1 includes pedestrian sidewalks and one-way bike lanes between King Street and Bowman Street, with three possible sub-alternatives for the area between Bowman Street and Moore Avenue, where there is more road space.
Alternative 2 has been developed as a “pedestrian-focused” corridor, with wider sidewalks and boulevards. There are no dedicated bike lanes as part of this design, and as a result, nearby properties will be less impacted compared to Alternative 1. Instead, cyclists would be directed to a yet-to-be determined parallel route, to be identified in the coming update to the city’s Transportation Master Plan.
Details on all Alternative 1 options and Alternative 2 are available in the News feed, under First public information and consultation. Detailed plans for all options are available in the Project Library, in the Design Alternatives Technical Drawings folder.
The survey will remain open until October 6, 2020.
Share Union Street design alternatives survey on FacebookShare Union Street design alternatives survey on TwitterShare Union Street design alternatives survey on LinkedinEmail Union Street design alternatives survey link
Page last updated: 04 Mar 2024, 04:46 PM
Project Timeline
July 2020
Union Street East reconstruction has finished this stage
Notice of project delivered to residents
July-August 2020
Union Street East reconstruction has finished this stage
Design alternatives developed
August - September 2020
Union Street East reconstruction has finished this stage
Design options presented for feedback
November 2021
Union Street East reconstruction has finished this stage
Feedback reviewed, new conceptual design alternative presented for comment
April 2022
Union Street East reconstruction has finished this stage
Recommended design alternative presented for review, detailed design begins
Winter 2024
Union Street East reconstruction is currently at this stage
Removal of bike lanes from design.
Spring/Summer 2024
this is an upcoming stage for Union Street East reconstruction
Revision of detailed design.
Summer/Fall 2024
this is an upcoming stage for Union Street East reconstruction
Property acquisition.
Fall/Winter 2024
this is an upcoming stage for Union Street East reconstruction
Design Stage Public Information Centre (session).
April to November 2025
this is an upcoming stage for Union Street East reconstruction
Phase 1 construction (tentative).
April to November 2026
this is an upcoming stage for Union Street East reconstruction