Stirling Avenue South: Mausser Avenue to Greenbrook Drive
This road reconstruction project is complete.
Road & Sewer improvements have been scheduled on Stirling Ave. S. between Greenbrook Dr. and Mausser Ave.
Specific improvements scheduled for this street are:
Upgrade the existing storm sewer, sanitary sewer and water mains.
- Replace existing sanitary and water services from the new mains to the property line.
- Curb and gutter, and sidewalks will be installed.
- Upgrade the asphalt roadway.
- Replace all driveway ramp entrances in concrete.
These improvements are being done to upgrade the existing, deteriorated underground services and above-ground surface features, in order to prevent future system failure.
In order to carry out these improvements, it will be necessary to close this street to through traffic. Prior to any road closure, signs will be posted on the approaching streets advising motorists of the date and the duration of the closure.
Pedestrian access will be maintained to all properties at all times and vehicular access to all properties within the construction area will be maintained for as long as possible. On-street parking permits, which will allow parking on adjacent side streets, will be hand-delivered to affected homes before vehicular access is cut off.
Progress and major milestones will be posted on this project page. Subscribe to get project updates by using the Stay Informed 'Subscribe' button.
This road reconstruction project is complete.