FAQs
When is construction planned?
Construction is planned to begin in 2025 and extend until 2026
Where is the new driveway to the transit terminal located?
The proposed location of the driveway is on Doon Valley Drive, within the existing Lot 4 on campus.
Refer to the image of the existing and proposed bus routes.