20 University Ave E (Z-23-03)

Share 20 University Ave E (Z-23-03) on Facebook Share 20 University Ave E (Z-23-03) on Twitter Share 20 University Ave E (Z-23-03) on Linkedin Email 20 University Ave E (Z-23-03) link

Rendering of proposed building looking northwestApplication to amend zoning for 20 University Ave E

Changes to the Zoning Bylaw for this location are required before a permit can be issued. This means that they submit an application that is reviewed by city planners and other agencies plus city council before anything can be built.

20 University Inc. is proposing a 25-storey, mixed-use building comprised of 260 bedrooms (260 dwelling units) and 647 square m of ground floor commercial space.

Zoning bylaw changes requested include:

  • removing the holding (H) symbol from the subject property
  • increasing the maximum permitted horizontal tower dimension from 40.0 m to 43.0 m
  • changing the bicycling parking space requirements to allow for stacked bicycle parking;
  • increasing the maximum driveway width from 7.0 metres to 10.0 metres;
  • reducing the minimum required parking rate
  • all a portion of the building to have 26 storeys
  • reduce the minimum tower stepback
  • reduce the minimum tower separation distance to the westerly lot line from 11 m to 10.5 m

View the documents submitted by the development company under supporting documents on this page for more details and drawings.

Building height, units, housing types

Tallest tower: 25 storeys

Number of units: 260

Number of bedrooms: 260

Housing types: apartments

Non-residential floor space

Commercial space: 647 square m

Parking

Parking: 197

Bicycle parking:182 (stacked, secure parking room)

You can provide feedback to the planning department, and it will be shared with the council, or ask a question to learn more about this application.

Images are provided by the applicant and may not reflect the final design approved by the planning division.

Rendering of proposed building looking northwestApplication to amend zoning for 20 University Ave E

Changes to the Zoning Bylaw for this location are required before a permit can be issued. This means that they submit an application that is reviewed by city planners and other agencies plus city council before anything can be built.

20 University Inc. is proposing a 25-storey, mixed-use building comprised of 260 bedrooms (260 dwelling units) and 647 square m of ground floor commercial space.

Zoning bylaw changes requested include:

  • removing the holding (H) symbol from the subject property
  • increasing the maximum permitted horizontal tower dimension from 40.0 m to 43.0 m
  • changing the bicycling parking space requirements to allow for stacked bicycle parking;
  • increasing the maximum driveway width from 7.0 metres to 10.0 metres;
  • reducing the minimum required parking rate
  • all a portion of the building to have 26 storeys
  • reduce the minimum tower stepback
  • reduce the minimum tower separation distance to the westerly lot line from 11 m to 10.5 m

View the documents submitted by the development company under supporting documents on this page for more details and drawings.

Building height, units, housing types

Tallest tower: 25 storeys

Number of units: 260

Number of bedrooms: 260

Housing types: apartments

Non-residential floor space

Commercial space: 647 square m

Parking

Parking: 197

Bicycle parking:182 (stacked, secure parking room)

You can provide feedback to the planning department, and it will be shared with the council, or ask a question to learn more about this application.

Images are provided by the applicant and may not reflect the final design approved by the planning division.

CLOSED: This discussion has concluded.

Questions and answers will be published on this site for public viewing. If your username includes your first or last name, or your email address, these will be available for public viewing. Do not include personal or identifying information in your question; if your question is of a personal nature, consider contacting a member of the project team directly. For more information, please refer to our privacy policy.

Questions will be answered by a member of the Planning department within two business days. Some questions may require more time but they will be answered as soon as the information for the response can be collected. 

Page last updated: 08 Nov 2024, 08:09 AM