Share Answer our Questionnaire by Sept. 4, 2024 on Facebook
Share Answer our Questionnaire by Sept. 4, 2024 on Linkedin
Email Answer our Questionnaire by Sept. 4, 2024 link
To help us address any specific issues or considerations, we ask that you please complete the Resident/Owner Questionnaire. Help us take your needs into consideration when planning the road reconstruction.
We would like to hear from you about:
- Any issues you had in the past with sewer backups, flooding, or water pressure
- What we might need to know about you before we begin construction
- If you have any plans to redevelop your property (example: severance, additional units)
- Your interest in having a private storm drain connection installed
Please take a few minutes to answer our Resident/Owner Questionnaire.
The questionnaire closes Oct. 4, 2024.
If you have any questions or concerns, please contact the project manager Kevin Mick at kevin.mick@kitchener.ca or 519-741-2200 x7884 (TTY: 1-866-969-9994).
Share Project Information and Surveyor Information on Facebook
Share Project Information and Surveyor Information on Linkedin
Email Project Information and Surveyor Information link
During the next few weeks, you may observe surveyors undertaking a detailed field survey in your neighbourhood. The survey is being completed in preparation for the reconstruction of the street listed above.
As is common with many city reconstruction projects, the service of a consulting engineering firm has been arranged to work with City of Kitchener staff. The firm of AECOM has been selected for this project.
In order to gather the required details, the survey will include the frontage of your property as well as the street. The purpose of this survey is to locate all existing features (trees, gardens, steps and walkways, etc.) on the plans for preliminary study and final design.
The surveyors should not interfere with your regular activities but will identify themselves if you have any questions.
The reconstruction is being done to replace the older, deteriorated underground services.
The following is a brief list of specific improvements being considered:
- Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required.
- Replace existing sanitary and water services from the new mains to the property line.
- Curb and gutter, and sidewalks will be installed.
- Upgrade the asphalt roadway.
- Replace all driveway ramp entrances in concrete.
- Install and/or replace retaining walls.
It is anticipated that construction will occur in the spring of 2025.
If you have any questions and/or concerns about this project, please feel free to contact the project manager, Kevin Mick, by phone at 519-741-2200 ext. 7884 or by email at kevin.mick@kitchener.ca.