As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood. This reconstruction is being done to replace the older, deteriorated underground services.

The following is a brief list of specific improvements being considered:

  • Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required.
  • Replace existing sanitary and water services from the new mains to the property line.
  • Curb and gutter, and sidewalks will be installed.
  • Replace all driveway ramp entrances in concrete.
  • Install and/or replace retaining walls.

It is anticipated that construction will occur in 2025.

Progress and major milestones will be posted on this project page. Subscribe to get email notification of project updates by using the Stay Informed 'Subscribe' button.

Road reconstructions help Kitchener adapt to climate change

Replacing outdated stormwater pipes and adding green infrastructure during road construction makes Kitchener more resilient to future flooding caused by climate change. This road reconstruction project is funded in part by the Government of Canada. For more information about the City of Kitchener's partnership with the Government of Canada through the Disaster Mitigation and Adaptation Fund, visit kitchener.ca/Stormwater.

Soak up rain and reduce runoff

Kitchener has partnered with Reep Green Solutions to help you make changes to beautify your yard and reduce runoff. To learn more and see if you qualify for a free, on-site consultation with a landscape designer, visit Reep's Rain Smart Neighbourhoods.


As part of the City of Kitchener’s ongoing efforts to provide exceptional service, staff has scheduled road and sewer improvements in your neighbourhood. This reconstruction is being done to replace the older, deteriorated underground services.

The following is a brief list of specific improvements being considered:

  • Upgrade the existing storm sewer, sanitary sewer and water mains, including additional hydrants as required.
  • Replace existing sanitary and water services from the new mains to the property line.
  • Curb and gutter, and sidewalks will be installed.
  • Replace all driveway ramp entrances in concrete.
  • Install and/or replace retaining walls.

It is anticipated that construction will occur in 2025.

Progress and major milestones will be posted on this project page. Subscribe to get email notification of project updates by using the Stay Informed 'Subscribe' button.

Road reconstructions help Kitchener adapt to climate change

Replacing outdated stormwater pipes and adding green infrastructure during road construction makes Kitchener more resilient to future flooding caused by climate change. This road reconstruction project is funded in part by the Government of Canada. For more information about the City of Kitchener's partnership with the Government of Canada through the Disaster Mitigation and Adaptation Fund, visit kitchener.ca/Stormwater.

Soak up rain and reduce runoff

Kitchener has partnered with Reep Green Solutions to help you make changes to beautify your yard and reduce runoff. To learn more and see if you qualify for a free, on-site consultation with a landscape designer, visit Reep's Rain Smart Neighbourhoods.

  • Questionnaire now open until Sept. 16

    Share Questionnaire now open until Sept. 16 on Facebook Share Questionnaire now open until Sept. 16 on Twitter Share Questionnaire now open until Sept. 16 on Linkedin Email Questionnaire now open until Sept. 16 link

    To help us address any specific issues or considerations, we ask that you please complete the Resident/Owner Questionnaire. Help us take your needs into consideration when planning the road reconstruction.

    We would like to hear from you about:

    • Any issues you had in the past with sewer backups, flooding, or water pressure
    • What we might need to know about you before we begin construction
    • If you have any plans to redevelop your property (example: severance, additional units)
    • Your interest in having a private storm drain connection installed

    Please take a few minutes to answer our Resident/Owner Questionnaire.

    The questionnaire closes Sept. 16, 2024.

  • Surveyors in your neighbourhood

    Share Surveyors in your neighbourhood on Facebook Share Surveyors in your neighbourhood on Twitter Share Surveyors in your neighbourhood on Linkedin Email Surveyors in your neighbourhood link

    During the next few weeks, you may observe surveyors undertaking a detailed field survey in your neighbourhood. The survey is being completed in preparation for the reconstruction of the street(s) listed above.

    In order to gather the required details, the survey will include the frontage of your property as well as the street. The purpose of this survey is to locate all existing features (trees, gardens, steps and walkways, etc.) on the plans for preliminary study and final design.

    The surveyors should not interfere with your regular activities but will identify themselves if you have any questions.

Page last updated: 14 Nov 2024, 02:22 PM