The Region of Waterloo has begun the design and environmental assessment for a proposed pedestrian bridge over the Conestogo River, as part of the Guelph to Goderich (G2G) Rail Trail. The proposed bridge is located between Powell Road and Line 86, near the Village of Wallenstein. Locally the trail is known as the Kissing Bridge Trailway and is the eastern portion of the G2G Rail Trail.

The G2G Rail Trail is an accessible, multi-use, off-road recreational trail from Guelph to Goderich on a former railway line. Locally the trail runs through the north side of the region from West Montrose to Linwood.

There is a gap on this trail at the crossing of the Conestogo River in Wallenstein. This is because the original railway bridge was removed when the railway line was closed. This proposed pedestrian and cyclist bridge will close the gap on this trail, improving the trail continuity and user experience.

The expected cost of this project is approximately $7.5 million. This cost is being shared by the Region of Waterloo, Township of Wellesley, the G2G Rail Trail organization and provincial and/or federal grants.

Municipal Class Environmental Assessment

The project is following the Schedule B process in the Municipal Class Environmental Assessment 2023 (Class EA). The Region has hired Doug Dixon & Associates Inc. to complete the Class EA. The project team has assessed various designs for this bridge. Based on technical review of the site, the project team is suggesting a design that has the least environmental impact while making sure it is durable and accessible for everybody to use.

Feedback opportunities

Thank you to everyone who attended the public meeting and provided your feedback on this project. The survey is now closed and we are working on summarizing the input received during this time. We will be bringing a report forward to Council for approval in early 2026. Stay tuned for more updates.

Before: Existing trail gap with no bridge After: Trail with bridge design

Survey

Ask a question

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Jim Ellerman

Head of Transportation Capital Projects

Project team

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found

Updates